|
Laguna Lake Development Authority |
|
|
MEMORANDUM CIRCULAR No. 2005-4 , Series of 2005 |
|
|
Subject : |
GUIDELINES/PROCEDURES ON THE SUBMISSION OF ANALYSIS SURVEY/VERIFICATION/INSPECTIONS/MONITORING REPORTS
|
I.
PURPOSE
Pursuant
to the Code of Conduct and Ethical Standards for Public Official and Employees (R.A.
6713), this Memorandum Circular is hereby issued to prescribe the manner
procedure of submitting Reports of Inspection (ROl) and Results of
Laboratory Analysis (ROLA) before the Office of the General Manager (OGM).
This
Memorandum Circular shall I apply to the following concerned officials and
employees of the:
1.
Engineering and Construction Division
2.
Special Concern Division
3.
Pollution and Control
Division
4.
Lake Management Division
5.
Environmental Quality Management Division
III.
RESPONSIBILITY
The
Head/Officer-In-Charge of the Division shall ensure full compliance , with the
guidelines herein set-forth
The
General Manager shall administer the oath of the sworn statement indicated below
the certified ROI/ROLA.
IV.
PROCEDURES
1. The concerned official and employees
of the Authority who conduct the water analysis, survey/area verification,
inspection/monitoring of industries, shoreland, fishpen / fishcages shall
prepare a ROLA/ROI in triplicate copies indicating the required statement. (see
Attachment "A” or "B"), the original copy to be
submitted to the Legal Division, another copy to the respective
division unit file, and the last copy to be retained by the OGM.
2.
The Head/OIC shall concerned and
transmit the ROLA/ROI to the OGM.
3.
After the General Manager administered the oath, the OGM shall distribute the
certified reports to the respective Divisions for their appropriate action.
V.
EFFECTIVITY
10
November 2005, Pasig City, Metro Manila.
Original Signed CASIMIRO
A. YNARES, III General Manager |